Solution-oriented, decisive and transparent.

Jeroen van Loon
Construction manager
The cooperation with BKV is very open, transparent and honest. The employees of BKV like to think along and come up with surprising solutions to get the lifting job done. I think a good example is working in very small spaces. The BKV teams have proven this several times both at Maasvlakte 2 and at Optimization of Wind Farms Oosterschelde Barrier.
Windfarm Maasvlakte
ContractorVestas
CraneLR1600
ProjectConstructing 22 wind turbines
TypeVestas V162 and Vestas V117
Hub height107 meter and 84 meter
LocationNetherlands, Maasvlakte
This wind farm is in a fantastic location. A number of turbines are located on the beach and when there is high water, the foot of the turbine is in the water. We have built 2 different types of turbines here.
The ships had to be unloaded at night and on weekends in order not to disrupt the operation of the container terminal. After unloading, the components were taken to the storage area. Here, several of our crane operators and cranes helped to store the components in an organized way.