Flexible, professional and supportive
Schani Swift
Lead Construction Site Manager Nordex – Wieringermeer
BKV were a highly professional and integrated part of the Project Site family. Their flexibility and drive supported the Site team in realising the delivery the large construction projects in timely fashion whilst also supporting problem resolutions. As a site, we were able to chase weather windows at around the clock to complete installations in usually poor weather periods. This could not have been achieved without the support of all personnel and the crane teams.
Windfarm Wieringermeer
ContractorNordex
CraneLiebherr LR1750, Liebherr LTM 1750, Demag-TC2800 & Liebherr LR 1600/2
ProjectConstructing 82 windturbines
TypeNordex N117/3600
Hub height120 meter
Capacity4,3 MWatt
LocationNetherlands, Wieringermeer
Challenging project in North Holland with various cranes and a professional BKV team. BKV erected 82 wind turbines for Vattenfall. BKV is proud that this project was completed by our top team, from planner to driver and from crane operator to engineer. The mast heights are over 118 metres and the tip height reaches an impressive 177 metres.