Windfarm Wieringermeer

More details

Flexible, professional and supportive

Schani Swift

Lead Construction Site Manager Nordex – Wieringermeer

BKV were a highly professional and integrated part of the Project Site family. Their flexibility and drive supported the Site team in realising the delivery the large construction projects in timely fashion whilst also supporting problem resolutions. As a site, we were able to chase weather windows at around the clock to complete installations in usually poor weather periods. This could not have been achieved without the support of all personnel and the crane teams.

Challenging project in North Holland with various cranes and a professional BKV team. BKV erected 82 wind turbines for Vattenfall. BKV is proud that this project was completed by our top team, from planner to driver and from crane operator to engineer. The mast heights are over 118 metres and the tip height reaches an impressive 177 metres.