Windfarm Dintelhaven

More details

Can-do mentality, flexibility, personal.

Niels Robbertsen

Project Manager Business in Wind

This complicated project in a busy port required lifting between road, water and rail. Thanks to a succesful preparation phase, correct crane plans and a top team, this project was finished in time with pleasure and success.

In Dintelhaven we provided the vertical transport of 4 Vestas V90 3MW turbines with our TC2800 and its auxiliary crane. In 2005, these turbines were the tallest turbines in the Netherlands.

The location was a challenge because the dead end road to the Ferry was within reach of the turbine. This was very well coordinated by traffic controllers, allowing the work to take place safely.