Windfarm Dhuy

More details

Profesionalism, safety and flexibility.

Gilbert de Haas

Sitemanager Vestas

The collaboration with BKV is particularly good. The words professionalism, safety, flexibility and thinking along with a project certainly come into their own.

The LTM1750 provided the Pre-install for the 4 wind turbines in Dhuy. After that, the LR1600 and the auxiliary crane built the 4 wind turbines in a short period of time.