Windfarm Klaverspoor
ContractorNordex
CraneLG1750
ProjectConstructing 6 wind turbines
TypeN149 TS135
Hub height135m
LocationNetherlands, Klaverspoor
Project Klaverspoor was very interesting. The ability of the subsurface provided a challenge. The wind turbines were located in a swampy area, which required many wooden mats and steel plates to distribute the stamping pressure. Because the stamping pressure was distributed so correctly, we were able to build 6 beautiful wind turbines.